Projects
For the past six years Polaris Consulting, LLC has served onsite at the largest auto-manufacturing facility in the United State throughout various departments including: plant maintenance, production engineering, and information systems. The feeds below highlight some of our key projects by our Principal Consultant.
Parts Replenishment System (2004-08)
- Electronic Parts Call System for Internal Conveyance
- Served as IS SME & Technical Consultant
- Deployed upgrades in Assembly, Bodyweld, Stamping
- Configured/managed mobile hardware (200+ Devices)
- Eliminated database/Wireless issues w/ system
- Developed customized reports
- Provided Training/documentation for Admins
Electronic Specification System (2006-08)
- Electronic Spec Check System used in Assembly
- Served on regional development group
- Configured/Deployed system
- Developed/Integrated Airbag scan Input function
- Configured/managed mobile hardware

Report Management System (2003)
- Comprehensive reporting Interface/subscriptions
- Over 1500 users & 50,000 reports/month
Completed Rate of Vehicle (2005)
- Quality tracking system for pilot/sampling
- Slated for Regional Use/New Plants
Streamlined Inventory Modules (2004)
- Inventory Worksheets/Plasma Screens For Stamping
- Integrated Paging Module for low inventory
Andon Reporting Modules
- Remote Paint Andon (2005)
- Bodyweld Cimplicity/CMMS Integration (2002)
Maximo Reporting Strategy Lead (2007)
Floor Counters System (2006)
- Progressive line counters for Assembly Logistics
- Integration w/ AVI, PLC, & Internal eKanban
- Slated for Regional Use / New Plants
Andon Integration Modules
- Automatically generated Work Orders (2003)
ActivPlant Prototype in Stamping
Cimplicity Prototype in Bodyweld
- Assembly Parts Call (2007)
Migrated Legacy PLC Push Buttons to PDA in Line 2
- Andon vs Cognos Overtime Comparison (2003)
Tool for Comparing Overtime entry vs. actual overtime
Assembly Active RFID Pilot (2008)
- Real Time Location System (RTLS) testing